Image D0001 163 by Michael Pearcy

 
DLS Possible Boathouse Pictures > D0001 163
General collection of Suggestions for use as display pictures in The Boathouse.
D0001 163 
 20/01/11 Dorney Lake Rowing Centre preparations for 2012 Olympics. A new bridge weighing 280 tonnes was lifted into position between the main Lake and the 'Return Channel' by a 1,200 tonne crane. Full press release available. 
 Keywords: dorney, lake, rowing, centre, Eton, olympic, venue, 2012, flat, water, sports, new return bridge, rowecord, morrison, crane, paralympic.
D0001 163 
 20/01/11 Dorney Lake Rowing Centre preparations for 2012 Olympics. A new bridge weighing 280 tonnes was lifted into position between the main Lake and the 'Return Channel' by a 1,200 tonne crane. Full press release available. 
 Keywords: dorney, lake, rowing, centre, Eton, olympic, venue, 2012, flat, water, sports, new return bridge, rowecord, morrison, crane, paralympic.
© Michael Pearcy Words&Pictures

20/01/11 Dorney Lake Rowing Centre preparations for 2012 Olympics. A

new bridge weighing 280 tonnes was lifted into position between the main Lake and the 'Return Channel' by a 1,200 tonne crane. Full press release available.


 Download (86 KB)  or download smaller size